GSE-Web lets you reserve stock quantities for a project, a job site or a customer before the actual shipment. Reserved stock is visible but unavailable for other operations — zero conflicts, zero bad surprises on D-day.
| Product | Reserved | Avail. |
|---|---|---|
| FO Cable 24FO | ×10 🔒 | 75 |
| SC/APC Connector | ×200 🔒 | 340 |
| Splice sleeve | ×30 🔒 | 70 |
Why stock conflicts are critical in project logistics
Without a reservation system, here is what happens regularly:
Stock used by someone else
The equipment planned for Monday's job site was issued on Friday by another team. Result: delay and emergency.
Shortage on D-day
Without a reservation, stock shown as available may disappear between planning and shipment.
Impossible to plan
Without visibility on reserved stock, the logistics manager does not know what is really available for new projects.
What GSE-Web brings you with stock reservations
Six concrete features to manage your reservations from A to Z.
Stock reservation on one or several products for a given date
Linking reservations to a project, job site or customer
Reserved stock visible but locked for other operations
Dashboard of current reservations: what, for whom, when
1-click conversion to an issue movement note on D-day
Alerts if available stock falls below current reservation level
How it works: 4 simple steps
From blocking stock to actual issue, everything happens in GSE-Web.
Create a reservation
Select the product(s), enter the quantities, link the project or customer, and enter the desired date.
Stock is blocked
Reserved quantities are visible in the total stock but cannot be used for other operations. Other teams clearly see what is available and what is already reserved.
On D-day: 1-click conversion to an issue
From the reservations dashboard, convert the reservation into an issue movement note. No re-entry, no possible error.
Reserved stock is released and the issue is recorded
The issue is tracked with automatic timestamp. Reserved stock is consumed, available stock updates in real time.
Who uses stock reservations?
Three sectors where stock reservation is a daily challenge.
Construction / Telecom
Reserve cables, boxes and tools for a job site planned in 3 weeks — equipment is blocked and no other team can take it.
Event logistics
Block stage equipment for an event before other teams take it — the event date is known, stock must be too.
Industry / Manufacturing
Reserve raw materials for a planned production order — the production manager knows exactly what is available to launch a new order.